Pages

Thursday, August 13, 2015

Our new home in Grand Rapids

OK, so we closed on our new condo in Eaglecrest less than two weeks ago and so far we have:
  • replaced the garage door opener (Overhead door)
  • selected closet organizers for the main floor (Standard Lumber)
  • picked out new carpet and arranged to have it installed on main floor (Verhey Carpet)
  • arranged to replace the furnace and air conditioner (Bill Lawrence)
  • arranged to install a new water heater (Dave Herrema)
  • met with a designer to upgrade the very small but very efficient kitchen (Williams Studio)
  • picked out and arranged for delivery of all new appliances this Friday (Gerrit's Appliance)
  • picked out four new lighting fixtures and four new ceiling fans (Grand Rapids Lighting)
  • decided on Sept. 1 as our moving date to have our furniture brought from Rhode Island (National Van Lines)
  • begun the process of repainting bedrooms/closets on the first floor (Susan)
  • connected with an electrician to update numerous electrical fixtures
Mind you Susan did nearly all of the coordinating, phone calling and meeting with one person and another -- incroyable, la donna e incredible!


No comments: